Took these movies the day we left for Jon's cabin in June. We had had record rainfall the previous few days and this was the result. Mom and dad were not home to see it all and at first glimps, we figured the swing was gone. But, we were wrong! The swing still stands...barely! (the images were captured with my cell phone so the quality is not the best, but you get the picture...)
Saturday, July 12, 2008
Phase 2 Done


The second phase of our attic project was completed this past week when a local contractor came in and put in new steps into the attic. The old steps required you to duck under the roofline to get into the attic and we wanted to bring the steps up the center of the room-to-be. At the same time, they installed a roof cap which was needed to vent hot air since we have insulated the entire third floor.

The framing for the new stairway took a chunk out of the corner of the boys' current room but was a lot less intrusive than we imagined. We're not sure if we're going to make it a closet or a desk area, but we have a lot more space remaining than we expected.

Next up is more drywalling and wiring and heating and cooling and insulating... point being, still a long ways to go.
Subscribe to:
Posts (Atom)